Tag: #yourProject

#yourProject – Haflinger Tyres – Group 7

The tire with Gripp or even more Gripp

Which tyres does a Haflinger belong to? Often terms such as maloya, semperite or gear tyres fall. At the Haflinger meetings you can see the great variety. Normal exits create all, exceptions are only with mud and mud. And at the price.
In this article, we limit ourselves to the serial dimensions of 12 and 13 inches.
Many thanks to Bernd, Felix and Lorenz for their cooperation.

Work effort: —
Material: 250 – 800 Euro
Tool: none –> Assembly operation

Read More

#yourProject – Introduction

Whether engine, gearbox, electrics, brakes… Get into technology with us.
Everything about the small boxer engine.


Do you have a basic technical talent? We know where to screw and where to find the experts. Every week we tinker. Whether in person on site, in a group or with the help of WhatsApp. Trust yourself and get in touch with us!


Before

After


All tricks and tips on this page without guarantee.
The author assumes no liability!


We start in loose order: engine bodywork, axle cuff, oil and brake service, handbrake adjustment and much more.

#yourProject – Engine – Group 1

Motor revision with the help of a checklist

Crankshaft

The construction of an engine for the Puch 500 or Haflinger can only be described to a limited extent in a contribution, a joint overhaul with an experienced screwdriver is preferable to all theory. Consider that the parts are expensive and rare, the probability of error can usually be reduced by experience. Many thanks to the experienced screwdrivers, especially Erwin and Heinz for their always open ear and their esteemed answers. And to the classic car practice with a comprehensive contribution about the small boxer engine.

Time: 20 – 40 hours

Cost: 200 – 3,000 euros

Tool: standard, spare parts catalog, torque wrench 10-400 Nm, fine measuring tools, piston ring clamping belt, div. Holding and assembly aids

Read More

#yourProject – Dynastarter – Group 9

The Dynastarter – from charging and starting

In this article we deal with topics such as field coils, anchors, coals, but then also air gap, anchor turning off, collector saw, closed ball bearings, insulator discs, strong soldering iron, counter holder fan wheel, abrasion, 20 amperes… Our thanks go to our 2 Bosch specialists G&G.

Work: 2 – 10 hours
Material: 20/30 – 180/350 Euro
Tool: standard plus soldering iron, mounting mandrel

Read More

#yourProject – Puch Brakes – Group 7

Who doesn’t know? Poor braking effect, grinding noise, long pedal path

What does the brake anchor plate and the setting eccentric have to do with it? The anchor plate is rarely straight and the eccentrics do not always perform their function. Our thanks for the impulse for this project goes to an experienced “bunny” in the Ruhr area.

Work effort: 2-3 hours
Material: 0-50 Euro
Tool: standard plus self-construction test facility

Read More